Testing and quality management


Test equipment


For the 100% testing, we have 2 fully automatic transformer-test-systems and one automatic inductor test systemTest equipment

  • High voltage test
  • Current, resp. primary current consumption
  • Voltages primary and secondary
  • Insulation resistance
  • Winding resistance
  • Earth wire test
  • Phasing, winding polarity
  • Winding short-circuit test
  • automatic connection via compressed air
  • Documentation of all test results on the computer with date and time, possible with serial number


© 2018 Tauscher Transformatoren GmbH                                                                                                                                   Impressum / Privacy Policy